IEC 62443 consultancy and project support

Translate an IEC 62443 requirement into a defined system boundary, accountable roles, engineering deliverables and traceable verification evidence.

IEC 62443 supportSL-Tsystem under consideration

Start with the role, system and decision

Role and responsibility

Asset owners, service providers, system integrators and product suppliers have different responsibilities. The scope identifies who owns each requirement and who must supply evidence.

System under consideration

Define the control functions, assets, zones, conduits and external services in scope. Interfaces and exclusions remain explicit so assurance decisions are not made against an assumed boundary.

Lifecycle decision

Identify whether the immediate need is readiness, risk assessment, requirements, secure design, supplier review, FAT/SAT evidence or handover close-out.

IEC 62443 is a series, not a single checklist. Applicability follows the organisation's role, the system and product boundaries, the contract and the lifecycle stage.

Choose the right workstream

Different engineering questions need different assessments

IEC 62443 readiness assessment

Establish the system boundary, review available evidence and record prioritised gaps before an assurance programme or project decision.

Explore this engagement route

IEC 62443-aligned OT cybersecurity risk assessment

Identify credible threat scenarios, consequences and proportionate risk treatments for the system under consideration.

Explore this engagement route

How to prepare for IEC 62443: readiness guide

Review the scope, people, architecture, requirements and evidence that should be assembled before an assessment.

Read the guide

How zones and conduits support OT network segmentation

Understand how assets are grouped and how required communication paths are defined, including brownfield constraints.

Read the explainer

FAT and SAT cybersecurity evidence checklist

Plan traceable verification evidence for factory acceptance, site acceptance, handover and unresolved assumptions.

Read the checklist

From requirement to retained evidence

StageEngineering questionExample artefact
DefinitionWhat is the system, who is responsible and which requirements apply?System boundary, responsibility and applicability record
Risk and requirementsWhich scenarios matter, what is the risk basis and what must the design achieve?Risk register and cybersecurity requirements specification
DesignHow do the architecture and supplier responses satisfy the requirements?Zone-and-conduit model, design review and evidence matrix
VerificationWhat can be demonstrated at FAT, SAT and commissioning?Test records, configuration extracts, exceptions and action tracker
HandoverWhich assumptions, deviations and residual risks remain?Close-out record and accepted residual-risk statement

Worked example: tracing a supplier requirement

Requirement
Vendor remote support must be authorised, time-bound and attributable to an individual.
Design response
Show the approved access service, identity source, role, connection path, session controls and log destination.
Verification
Test approval, account use, expiry or disablement and the expected audit events. Carry site-dependent routing and logging checks into SAT.
Evidence record
Link the requirement to the design documents, test record, configuration extract, exception status and responsible approver.

This is a worked technical example, not a completed Meridian client engagement.

Boundaries

Meridian provides engineering support and review. The work does not confer IEC certification, replace the accountable asset owner or supplier, approve residual risk on the client's behalf, or make every part of the series applicable to every project.

Related support and guidance

Related services

OT Cybersecurity Engineering Support

Choose this when your project needs specialist engineering capacity. A defined OT cybersecurity work package for risk, architecture, design review, supplier interfaces and assurance evidence within an active industrial project.

IEC 62443 Readiness Review

Start here if you are unsure what applies or where to begin. Establish the boundary, applicable lifecycle context, available evidence and next engineering work before a detailed IEC 62443 assessment or project decision.

IEC 62443 Gap Assessment

Choose this when you need a detailed view against agreed requirements. Requirement-by-requirement review of current arrangements and evidence against an agreed IEC 62443 baseline, producing a classified gap register and remediation roadmap.